Development Services |
Rate |
Feasibility Study |
Time and materials |
Field Inspection |
$53.00 per inspection |
Fire Flow Test |
$80.00 each |
Mainline Construction Inspection (0-1,200 feet) |
$525.00 + $262.50 administrative fee |
Mainline Construction Inspection (1,200-2,500 feet) |
$900.00 + $450.00 administrative fee |
Mainline Construction Inspection (2,500-5,000 feet) |
$1,440.00 + $720.00 administrative fee |
Mainline Construction Inspection (5,000-10,000 feet) |
$2,200.00 + $1,100.00 administrative fee |
Mainline Plan Check (0-1,200 feet) |
$525.00 + $262.50 administrative fee |
Mainline Plan Check (1,200-2,500 feet) |
$900.00 + $450.00 administrative fee |
Mainline Plan Check (2,500-5,000 feet) |
$1,440.00 + $720.00 administrative fee |
Mainline Plan Check (5,000-10,000 feet) |
$2,200.00 + $1,100.00 administrative fee |
Meter Installation (does not include connection fee) |
Parts + Material + Labor |
Service Lateral & Meter Installation |
$2,358.42 per 1" meter (estimated). Varies for meter larger than 1 " |
Water Standby Fee |
$20.00/acre per year |
Water Availability (Will Serve) Letter |
$80.00/parcel per letter |
Water Connection Permit Fee |
$60.00/connection |
Equipment/Materials |
Rate |
Materials |
Actual Cost |
3" Suction Hose |
$15.00/use |
4" Mud Pump |
$33.00/hour |
Air Compressor with Accessories |
$30.00/hour |
Backhoe |
$68.00/hour |
Bore Machine |
$27.00/hour |
Dump Truck - 10 Wheel |
$120.00/hour |
Pickup/Utility Truck |
$25.00/hour |
Skid Steer |
$68.00/hour |
Unspecified Equipment |
Rental Cost |
Utility Trailer |
$33.00/use |
Vactor |
$33.00/hour |
Welder |
$33.00/hour |
Temporary Meter Rental & User Charges |
Rate |
Meter Fee |
1.5 times the regular monthly meter charge |
Water Use Fee |
Highest tiered rate |
PPHCSD |
Services |